At a glance
- Operator
- Meta Platforms
- Location
- El Paso, Texas
- Status
- Under construction; Meta announced a financing venture in July 2026
- Capacity
- 1,000 MW — 1 GW compute capacity stated by Meta
What the source establishes
- The cited source identifies the operator and the El Paso data-center location. [1]
- This page does not treat a cloud-region label, building size, or investment as a power figure unless the source explicitly provides one.
- The pin is intentionally approximate so searchers can identify the relevant community without being misled into treating it as a parcel boundary.
Questions local records should answer
- Which parcels and phases are covered by current permits?
- What power, water, backup-generation, and tax arrangements apply to the specific campus?
- What public meetings, conditions, or environmental permits remain active?
How to verify a change
- Search city or county agendas for the operator and campus name.
- Check utility, water, and air-permit files separately.
- Compare a current local document with the operator’s location statement before relying on a capacity number.