At a glance
- Operator
- EdgeCore
- Location context
- Sterling, VA
- Record type
- campus-area
- Map precision
- City-level reference point
Operator-published context
Two EdgeCore locations in Ashburn are planned for 114 MW of critical IT load and 685,000 square feet.
This page records the operator’s published facility or campus identity. It does not establish a parcel boundary, tenant roster, current power draw, or local environmental impact; use public permits, utility filings, and local records for those questions.