Wallace Jackson Data Center Campus

Griffin (Spalding County) · Proposed Jan. 2026 (AJC); county zoning approved Jan. 22, 2026 per IDCnova (secondary)

Short answer

The currently checked public record identifies this as Wallace Jackson Data Center Campus in Griffin (Spalding County), GA. Current public-status summary: Proposed Jan. 2026 (AJC); county zoning approved Jan. 22, 2026 per IDCnova (secondary).

At a glance

Location
Griffin (Spalding County), GA
Developer / operator
Wallace Jackson LLC
Public status
Proposed Jan. 2026 (AJC); county zoning approved Jan. 22, 2026 per IDCnova (secondary)
Scale
AJC: $3.7B, 10 buildings, nearly 5M sq ft, about 190 acres; approved figure $3.9B (secondary)
Map position
City-area pin; not a parcel boundary.

What the sources establish

  • The currently checked public record identifies this as Wallace Jackson Data Center Campus in Griffin (Spalding County), GA. [1] [2]
  • Current public-status summary: Proposed Jan. 2026 (AJC); county zoning approved Jan. 22, 2026 per IDCnova (secondary). [1] [2]
  • Capacity / scale note: AJC: $3.7B, 10 buildings, nearly 5M sq ft, about 190 acres; approved figure $3.9B (secondary). [1] [2]

What this page does not establish

  • Exact building count, final load, and construction sequence unless stated in the listed documents.
  • Annual water use, generator configuration, or utility agreement terms unless separately disclosed.
  • Whether an approval, proposal, or court decision has changed after the sources were checked.

What to check next

  1. New planning-agenda, permit, zoning, and utility filings from the relevant jurisdiction.
  2. Air, water, and wetlands permits where applicable.
  3. Developer announcements that distinguish a proposal from construction or operation.