WHY IS LIFE SO HARD?Data-center field guide
Arizona facility dossier · sources checked 2026-11-08

Stream Data Centers — Goodyear campus

Stream's Goodyear campus is a seven-building site at 2950 S. Litchfield Road. The city's 2019 release describes a 418,000 sq ft acquisition on 157 acres with about 50 MW of critical load at full build-out; Stream's current site gives a 480 MW substation, which conflicts with the city's 350 MW figure.

At a glance

Operator
Stream Data Centers
Address
2950 S. Litchfield Road, Goodyear, AZ 85338 (operator)
Land
157 acres (city release, 2019)
Building
418,000 sq ft acquired (city release, 2019)
Power
Substation: 350 MW (city, 2019) vs 480 MW (operator)

What the sources establish

  • Stream's campus page describes a seven-building Goodyear campus at 2950 S. Litchfield Road. [1]
  • The city's release (February 15, 2019) says Stream acquired a 418,000 sq ft facility on 157 acres. [2]
  • The city release says the redeveloped facility will hold about 50 MW of critical load at full build-out, fully operational in the first quarter of 2020. [2]
  • The operator says its dedicated APS substation has an ultimate power capacity of 480 MW. [1]
  • The city release says the substation will be constructed by APS with an ultimate capacity of 350 MW. [2]

Timeline

  1. 2019-02-15 — City announces Stream's acquisition.
  2. 2020-Q1 — Projected operational date (city release).

Conflicts and corrections

The substation capacity is 350 MW in the city's 2019 release and 480 MW on Stream's current page. We have not found a source that explains the change.

What this page does not establish

  • Which substation figure is current.
  • Current operating status of each building.
  • Water source and generator count.

What to check next

  1. Ask Stream and APS which substation figure is current.
  2. Pull the Goodyear permit history for the site.
  3. Check the 2020 operational date against the current status.