At a glance
- Developer
- Plainsman Holdings LLC, formed by four Enid natives
- Jurisdiction
- City of Enid, Garfield County
- Land
- Nearly 1,750 acres across four sites
- Capacity (developer)
- About 2.75 GW of IT load and 3.3 GW of behind-the-meter generation
- Investment
- Up to $35 billion (developer estimate)
- Status
- Early stage; rezoning filed for two sites; no city water contract yet
What the sources establish
- Plainsman Holdings LLC proposes four data center campuses on a site the article describes as 1,735 acres in its lede and nearly 1,750 acres in the body. [1]
- Developers estimate up to $35 billion in capital investment. [1]
- At full capacity the developers describe about 2.75 GW of information technology power and 3.3 GW of behind-the-meter generation. [1]
- The project would use raw water from the Kaw Lake Pipeline with closed-loop cooling. The developers have not reached a water agreement with the city. [1]
- Power would come from on-site natural gas generation rather than the regional grid, and the developers say they would not allow diesel backup generators. [1]
- The project includes backup power and fiber for Vance Air Force Base, which the mayor says could help the base meet Defense Department backup-power requirements. [1]
- The Enid Regional Development Alliance says the project could create up to 4,000 construction jobs and more than 600 permanent jobs. [1]
- The developers say the project must meet Enid's noise limits of 55 decibels at night and 65 during the day, and they are considering setbacks and berms. [1]
- The project is at an early stage and has not been approved. Zoning goes first to the Metropolitan Area Planning Commission, an advisory body, and then to the Enid City Commission. [1]
Conflicts. Acreage is given as 1,735 in the lede and nearly 1,750 in the body. Power, cost and job figures are developer or booster claims. A tracker lists the company as Plainsmen; News 9 spells it Plainsman, and this page follows News 9. The article says revenue to schools and the city has not been determined.
Timeline
- Recent — The city completes a $356 million water line that officials say can double its water resources (News 9).
- Sept. 8, 2026 — News 9 reports the proposal. The project has not been approved.
What this page does not establish
- Whether the city will sell the industrial-park parcel it owns.
- A water contract with the city.
- Named hyperscaler tenants and a power provider.
- Air permits and emissions for the gas generation.
- The final acreage, since the article gives two figures.
- How much revenue would go to the city, county and schools.
What to check next
- Metropolitan Area Planning Commission agendas for the rezoning requests.
- Enid City Commission minutes and any water-supply contract.
- The filed rezoning applications for the two sites and the planned third site.
- Records for the Patriot Utility District the article mentions.