WHY IS LIFE SO HARD?Data-center field guide
Arizona facility dossier · sources checked 2026-11-08

Prime PHX01-02

Prime Data Centers' Phoenix campus is listed on its website, but the technical sheet with the PHX01-02 figures could not be retrieved. The 48 MW, 267,000 sq ft and Avondale address in earlier drafts are unverified here.

At a glance

Operator
Prime Data Centers
Market
Phoenix (campus listed on operator site)
Capacity
Not verified (technical sheet not retrieved)
Status
Not verified

What the sources establish

  • Prime Data Centers' website lists a Phoenix Campus PHX01 among its locations. [2]

Conflicts and corrections

An earlier draft gave 3704 S. Avondale Boulevard, 48 MW and 267,000 sq ft, labelled as under construction. These come from the technical sheet, which we could not open, so they are not confirmed here.

What this page does not establish

  • Address and parcel.
  • Megawatts, building area and construction status.
  • Permit and utility records.

What to check next

  1. Download the technical sheet from a browser that can open it, and check each figure against it.
  2. Pull Avondale's permit records for the address.
  3. Confirm the status with the operator.