At a glance
- Operator
- Novva (developer named in report)
- Jurisdiction
- City of Mesa, Arizona
- Location
- Loop 202 at Ellsworth and Warner roads
- Capacity
- First phase 96 MW (report)
- Status
- Phase one scheduled for late 2026 in a 2024-era report; not confirmed
What the sources establish
- A 2024-era report describes a first, 96 MW phase at Novva's Mesa campus, scheduled to deliver in late 2026. [1]
- At full build-out the campus was described as five data halls, an office building and a warehouse, with a total footprint of 1.3 million square feet, off the 202 loop at Ellsworth and Warner roads. [1]
Conflicts. No conflicting figures were retrieved. The source is a single report whose publication date is not in the excerpt, so the late-2026 delivery date should be treated as historical until confirmed.
Timeline
- 2024 (approx.) — Report describes the planned first phase and campus plan.
What this page does not establish
- Current construction status and any delivery.
- Power provider, substation and water source.
- Tenant or end user.
What to check next
- Mesa planning and permit records for Novva at Ellsworth and Warner.
- A current Novva statement on the first phase.
- Utility filings for the 96 MW load.