WHY IS LIFE SO HARD?Data-center field guide
Arizona facility dossier · sources checked 2026-11-08

Novva Mesa campus

A planned Mesa campus off the Loop 202 at Ellsworth and Warner roads. A 2024-era report described a first 96 MW phase and a campus plan of 1.3 million square feet. Only one source was retrieved, so current status is unknown.

At a glance

Operator
Novva (developer named in report)
Jurisdiction
City of Mesa, Arizona
Location
Loop 202 at Ellsworth and Warner roads
Capacity
First phase 96 MW (report)
Status
Phase one scheduled for late 2026 in a 2024-era report; not confirmed

What the sources establish

  • A 2024-era report describes a first, 96 MW phase at Novva's Mesa campus, scheduled to deliver in late 2026. [1]
  • At full build-out the campus was described as five data halls, an office building and a warehouse, with a total footprint of 1.3 million square feet, off the 202 loop at Ellsworth and Warner roads. [1]

Conflicts. No conflicting figures were retrieved. The source is a single report whose publication date is not in the excerpt, so the late-2026 delivery date should be treated as historical until confirmed.

Timeline

  1. 2024 (approx.) — Report describes the planned first phase and campus plan.

What this page does not establish

  • Current construction status and any delivery.
  • Power provider, substation and water source.
  • Tenant or end user.

What to check next

  1. Mesa planning and permit records for Novva at Ellsworth and Warner.
  2. A current Novva statement on the first phase.
  3. Utility filings for the 96 MW load.