At a glance
- Operator
- H5 Data Centers
- Address
- 2600 W. Germann Road, Chandler, AZ (2023 release)
- Building
- 180,000 sq ft (2023 release)
- Capacity
- Up to 26 MW IT load
- Expansion
- Phase 3, 30,000 sq ft (announced June 29, 2023)
What the sources establish
- H5 announced on June 29, 2023 a 30,000 sq ft Phase 3 expansion of its Chandler colocation facility at 2600 W. Germann Road. [2]
- The release describes the 180,000 sq ft building as supporting up to 26 MW of IT load and as a Tier III facility. [2]
- H5 says the design is waterless and supports 20+ kW per cabinet. [2]
Timeline
- 2023-06-29 — H5 announces the Phase 3 expansion.
What this page does not establish
- Whether Phase 3 has been completed.
- Generator and permit history.
- Water source for the facility.
What to check next
- Check Chandler's permit records for the Phase 3 expansion.
- Confirm the 26 MW figure with the operator or in APS service records.
- Read the operator's current facilities page for status.