Flexential Phoenix — Deer Valley

Flexential's November 2025 Deer Valley data-center sheet gives a 109,476 sq ft footprint, 5.02 MW of critical-load UPS capacity, 2(N+1) UPS redundancy, and N+1 cooling. The sheet is the operator's own; the public web page was not retrievable.

At a glance

Operator
Flexential
Location
Phoenix – Deer Valley
Footprint
109,476 sq ft (operator sheet, Nov 2025)
Capacity
5.02 MW critical-load UPS (operator sheet)
Redundancy
2(N+1) UPS; N+1 cooling; 100% power SLA

What the sources establish

  • Flexential's Deer Valley sheet (November 2025) lists a 109,476 sq ft footprint. [1]
  • The sheet lists 5.02 MW of critical-load UPS capacity with 2(N+1) UPS redundancy and N+1 cooling redundancy. [1]
  • The sheet claims a 100% SLA on power, network and bandwidth. [1]

Timeline

  1. 2025-11 — Operator data-center sheet published (filename date).

What this page does not establish

  • Total site megawatts or future phases.
  • Generator count and permit history.
  • Water source and cooling water use.

What to check next

  1. Check Phoenix's permit history for the Deer Valley facility.
  2. Confirm the 5.02 MW figure in the utility's service records.
  3. Read the operator's current web page once it is accessible.