WHY IS LIFE SO HARD?Data-center field guide
Arizona facility dossier · sources checked 2026-11-08

EdgeConneX PHX11

EdgeConneX's 2024 Phoenix data sheet describes PHX11 as an upcoming Mesa campus with 115.2 MW planned, aimed at the largest hyperscale users. No Mesa approval or construction record appears in the material we retrieved.

At a glance

Operator
EdgeConneX
Location
Mesa, Arizona (data sheet)
Capacity
115.2 MW planned (data sheet)
Status
Upcoming (data sheet, 2024)

What the sources establish

  • EdgeConneX's Phoenix data sheet describes PHX11 as an upcoming campus in Mesa, with 115.2 MW planned. [1]
  • The data sheet says PHX11 is aimed at the largest hyperscale users. [1]
  • The sheet lists Azure ExpressRoute and AWS DirectConnect as available across the Phoenix campuses. [1]
  • The company's global locations page lists the Phoenix region but gives no PHX11 detail. [2]

Timeline

  1. 2024-09 — Data sheet published (filename date).

What this page does not establish

  • Whether PHX11 has a Mesa zoning or site-plan approval.
  • Construction start, energization and status today.
  • Address and parcel.

What to check next

  1. Search Mesa's Legistar and permit records for an EdgeConneX case.
  2. Confirm the 115.2 MW planned figure with the operator.
  3. Check the APS and water service filings for the site.