EdgeConneX PHX01

EdgeConneX's 2024 Phoenix data sheet lists PHX01 in Tempe at 4.5 MW N+1, scalable to 6.5 MW, with 17,300 sq ft of raised floor for tenants. It is the smaller of the two EdgeConneX Phoenix sites in the sheet, which describes it as an existing facility.

At a glance

Operator
EdgeConneX
Location
Tempe, near Arizona State University (data sheet)
Capacity
4.5 MW N+1, scalable to 6.5 MW
Raised floor
17,300 sq ft (tenant space)
Status
Existing facility (data sheet, 2024); current status not confirmed

What the sources establish

  • EdgeConneX's Phoenix data sheet (2024) lists PHX01 at 4.5 MW N+1, scalable to 6.5 MW. [1]
  • The data sheet says PHX01 has 17,300 sq ft of raised floor for tenant use. [1]
  • The sheet places PHX01 and PHX11 near the Arizona State University campus in Tempe, less than 20 minutes from downtown Phoenix. [1]
  • The company's global locations page lists the Phoenix region but gives no PHX01 detail. [2]

Timeline

  1. 2024-09 — Data sheet published (filename date).

What this page does not establish

  • Current operating status and the operating date.
  • Generator count and water source.
  • Permit history for the Tempe site.

What to check next

  1. Check Tempe's building and site records for the EdgeConneX site.
  2. Confirm the 6.5 MW scalable figure with the operator.
  3. Pull APS service filings for the site.